B749 OFF THE LINK AT HIGHBRIDGE WAITING AT THE SIGNAL. CSXT 6222 AND CSXT 6231 WITH 23 CARS.14:56 HRS 
B749 WAITING FOR TWO MNCRR TRAINS TO PASS HIGHBRIDGE. 
B749 CLEARED TO GO NORTH ON THE HUDSON LINE.15:18 HRS 
SB MNCRR TRAIN MEETS B749 AT HIGHBRIDGE.15:20 HRS 
D&H 275 AT OAK POINT TOWER CP 5698 CP 5678 WITH 12 CARS ALONG WITH ACELA TRAIN # 2168. 17:15 HRS 
ACELA TRAIN OVERTAKES D&H 275 AT OAK POINT TOWER. 
D&H ENTERING OAK POINT YARD. 
D&H 275 USING LEAD TRACK FOR ITS RUN-AROUND. 
D&H 275 HOLDING FOR Y102 TO RETURN FROM HARLEM RIVER YARD WITH A CUT OF CARS FOR THEM. OAK POINT YARD. 
Y102 WORKING HARLEM RIVER YARD WITH A CUT OF CARS FOR THE D&H 275 HOLDING AT OAK POINT YARD.17:50 HRS 
Y102 SHOVING BACK TO OAK POINT WITH A CABOOSE # 21254 ON THE POINT AS A CIRCLE LINE BOAT PASSES THEM. 17:55 HRS 



D&H 275 FINALLY GETS ON ITS WAY NORTH WITH A TOTAL OF 24 CARS, SEEN HERE ON THE LINK WITH CP5678 & CP5698.18:40 HRS THIS CONCLUDES ANOTHER YONKERSRAILS ADVENTURE... |